- Lost & Unaccounted for
- Assessment
- Compliance
- Development
- Pipeline Integrity Support
-
- Oversee and Prioritize Pipeline Integrity Assessments
- Pipeline Record Review Prior to Run to Ensure Passage and Proper Pipeline Attributes are Provided to Vendors
- Appropriate Tool Selection Based on Pipeline Risks
- AGM Survey/Tracking if Necessary
- Pig Trap Evaluation for Piggability
- Vendor Bid for Competitive ILI Pricing
- Assist Operations with 3rd Party Support for ILI Run
- Data Analysis and Dig Prioritization Following ILI Data Receipt
- Remediation Dig Project Management and Coordinate Appropriate Anomaly Evaluation and Repair
- Confirm Reassessment Interval based on Assessment Interval Closeout
- Manage Continual Assessment Plan for Assets
- Maintain Integrity Maintenance Capital and Operational Budgets
- Risk
-
- Data Integration with Available Data for Risk Based Decision Making
- Participation in Annual Risk Ranking as Part of IMP
- IMP
-
- Annual Review and Approval of Integrity Management Plan
- Availability and Attendance in Audits as Required
- Attendance and Presentation with Annual IMP Meeting with Operations
- Breakout Tanks
-
- Assistance with Planning Tank Inspections and Maintaining Tank Records (planned for future)
- MISC (one off projects)
- Due Diligence
- Other
- Manage and Review Chemical Program Effectiveness
-
- Corrosion Coupons
- ABP and SRB Testing (Bug Bottles)
- Monitoring Point Review
- Chemical Usage Optimization
- Assist Operations with Maintenance Pigging Schedule and Documentation (this needs to be incorporated into risk)
- Coordinate with Chemical Vendor for Projects and Program
- Attendance and Presentation with Annual IMP Meeting with Operations
- Assist with Coupon Location Placement and Install
- Assist with Regulatory Compliance Reviews and Audits
- Annual CP Surveys for Pipeline and Tank Assets
- Design and Project Management Installation of ICCP (impressed current cathodic protection), AC Mitigation, and Sacrificial Anodes
- Management and Data Review/Analysis for Close Interval Surveys
- Communication with Other Pipeline Operators to Solve Interference Issues and Make Bonds Where Needed
- Support Operations as Needed
-
- Line Crossings
- Test Station Install
- Abnormal Operation Conditions
-
-
- Line Strike Support
- Leak Support
- Root Cause Analysis for Failures
-
-
- Anomaly Digs
- Damage Prevention
- Continual Improvement of IMP and O&M Tasks
- Support Engineering
-
- Design Considerations for Pipeline and Facilities
- Due Diligence Efforts
- Assist with Regulatory Compliance Reviews and Audits
- Facilitation of Annual IMP Compliance Meeting and Risk Ranking of Assets
- Distribute Acoustic Sensing (DAS) Fiber Based Leak Detection System Tuning
-
- Calibration
- Design
- Installation
- Trouble shooting
- Training
- Internal Negative Pressure Wave Systems
-
- Calibration
- Testing
- Troubleshooting
- Training
- Optical Gas Imaging System Design
- Calibration
- Troubleshooting
- Auditing/Providing Aid to Balancing, and Running Audit as Third Party
- Direct Fiber
- Wireless Network
- 24/7/365 Monitoring Service
- Dark Fiber Access